SEC.02

How a job runs

Five steps. Documented. Repeatable.

Same process on a two-storey semi as on a hospital wing. The paperwork scales — the discipline doesn't.

  1. STEP 01 · 48-hour turnaround

    Site visit

    A foreman walks the site with you. Access routes, ground bearing, tie-in points, footpath licence, neighbouring properties. Photos, measurements, notes — nothing quoted blind.

    Deliverables

    • Access notes
    • Photo record
    • Permit list
  2. STEP 02 · TG20 or bespoke drawing

    Design & written quote

    Standard configurations run against TG20:21. Anything outside the compliance envelope goes to our partner design engineer for calculated drawings and load statements.

    Deliverables

    • Fixed-price quote
    • Rig drawing
    • RAMS pack
  3. STEP 03 · 1–5 days typical

    Erect

    Our own crew — no subbed labour. Tubes, boards, fittings from our yard. Scaff-tag issued on handover. Photo record of every lift emailed to you the same day.

    Deliverables

    • Scaff-tag (green)
    • Handover photos
    • Sign-off sheet
  4. STEP 04 · Every 7 days on hire

    Weekly inspection

    For any rig on hire beyond 7 days, an SG28 inspection is completed and the scaff-tag re-issued. Missing boards, loose couplers, weather damage — logged and remedied.

    Deliverables

    • SG28 report
    • Updated tag
    • Remedial log
  5. STEP 05 · Pre-booked collection

    Strike & sign-off

    Booked at least 48 hours ahead so we can programme it in. Site left swept, ground protected, photo record delivered. Invoice closed same week.

    Deliverables

    • Clean site
    • Photo close-out
    • Final invoice