Recent projects

A working ledger.

A short selection of live and recently-struck jobs. Full portfolio and references available on request.

Semi-detached house with three-lift scaffold, temporary roof and shrink-wrap encapsulation, J&M Scaffolding truck parked outsideJOB.NO 2189
2026London

Residential refurbishment

Three-elevation independent scaffold with temporary roof and full shrink-wrap encapsulation for a domestic roof strip and re-cover.

Lifts
3
Encap.
Full
Duration
5 wks
White stucco London townhouse with green-netted scaffold and pavement fanJOB.NO 2174
2025Chelsea SW3

Heritage townhouse

Independent scaffold with debris netting and footpath fan for full external repaint and decorative works to a stucco-fronted townhouse.

Lifts
3
Fan
Yes
Duration
6 wks
Detached house with full perimeter scaffold supporting a new timber pitched roof structureJOB.NO 2151
2025Greater London

New-build roof

Full perimeter scaffold with edge protection for a new pitched-roof carcass on a detached property.

Perimeter
42 m
Lifts
2
Duration
4 wks
Retail parade with continuous roof-edge scaffold and yellow pedestrian protection standards over the shopfrontsJOB.NO 2118
2024Surrey

Retail parade re-roof

Full-length roof-edge scaffold with yellow pedestrian standards protecting the shopfronts below during a strip and re-tile of the parade roof.

Run
38 m
Lifts
2
Duration
5 wks
Two-storey brick semi with rear independent scaffold and J&M Scaffolding flatbed loaded with tube and boardsJOB.NO 2106
2024Greater London

Semi-detached rear

Independent rear scaffold with ladder access, loaded out from the J&M flatbed for a two-storey rear elevation.

Lifts
2
Bays
6
Duration
3 wks
Four-lift rear scaffold on a rendered period property with ladder access and site works belowJOB.NO 2094
2023London

Rear elevation refurb

Four-lift rear scaffold to a stucco period property during a full external refurbishment and rear extension programme.

Lifts
4
Access
Internal
Duration
10 wks
New-build terrace wrapped in breather membrane with full perimeter scaffold and telehandler on siteJOB.NO 2081
2023Greater London

New-build terrace

Full perimeter scaffold to a new-build terrace under weather membrane, with loading bays for the follow-on trades.

Perimeter
28 m
Lifts
3
Duration
12 wks
Semi-detached house with loft-height scaffold and clear shrink-wrapped temporary roof over a dormer loft conversionJOB.NO 2067
2023KT · Surbiton

Loft conversion

Loft-height scaffold with fully sheeted temporary roof for a dormer loft conversion, shrink-wrapped to keep the property watertight.

Lifts
3
Cover
Shrink-wrap
Duration
6 wks
High-street shopfront with three-lift scaffold, green debris netting and yellow pedestrian standardsJOB.NO 2052
2022London

High-street façade

Three-lift scaffold with green debris netting and pavement fan to a high-street retail unit during façade repairs.

Lifts
3
Fan
Yes
Duration
4 wks
Commercial building with large-span sheeted temporary roof and J&M Scaffolding truck loading outJOB.NO 2038
2022Greater London

Commercial temp roof

Large-span temporary roof over a commercial rear extension, fully sheeted and boarded for winter working.

Span
12 m
Cover
Sheeted
Duration
9 wks
Terraced building with green-netted scaffold and cantilevered pavement fan protecting the footpath belowJOB.NO 2021
2021London

Footpath fan

Cantilevered pavement fan with green debris netting for external works to a terrace, keeping the public footpath open below.

Fan
Yes
Lifts
3
Duration
6 wks
Terraced property with beamed temporary roof and monoflex shrink-wrap encapsulationJOB.NO 2133
2024London

Temporary roof

Beamed temporary roof with monoflex shrink-wrap encapsulation over a stripped-back terrace during major structural alterations.

Cover
Monoflex
Lifts
3
Duration
8 wks