J&M ScaffoldingQuote →

SEC.01

Full services register

Six categories. One standard.

Whether it's a two-storey chimney access or a 4,000 m² warehouse recladding, the erection standard doesn't move.

SRV.01

Residential access

Loft conversions, roof works, rear extensions, brickwork repointing, painting, gutter and chimney access. Independent or putlog rigs, standard 5-board lifts, boarded gantries where required.

Typical lift
2.0 m
Board width
5 boards
Erect time
1–2 days
Hire minimum
6 weeks

SRV.02

Commercial façade

Retail, offices, mixed-use. Full sheeting, debris netting, fan protection over pavements, pedestrian tunnels with council-licensed footpath closures.

Sheeting
Monoflex or Keder
Fan angle
45° / TG20
Loading
Very heavy duty
Nightworks
Available

SRV.03

Industrial & long-term

Warehouse re-cladding, plant maintenance access, silo works. Bespoke-designed by our partner engineer, weekly scaff-tag inspections, agreed hire terms.

Design
Bespoke drawings
Inspection
7-day cycle
Loading
SWL certified
Hire
6 mo — 5 yr

SRV.04

Temporary roofs

Fully sheeted TG20-compliant temporary roofs for weather-sensitive works. Keder or corrugated. Snow-load calculated per BS EN 12811.

Max span
24 m
Pitch
10–22°
Sheeting
Keder / corrugated
Wind rating
Beaufort 10

SRV.05

Loading bays & hoists

Cantilevered loading platforms, hoist-tie-ins, material gates. Rated and tagged. Integrated with your programme.

SWL
500–1500 kg
Gate type
Vertical / swing
Tie-ins
Anchor-tested
Cert
Load-test issued

SRV.06

Emergency call-out

Storm damage, façade instability, fire and flood response. Crew mobilised inside 4 hours across Greater London.

Response
≤ 4 hrs
Cover
24 / 7 / 365
Radius
M25 + 20 mi
Dispatch
020 8942 0513

Need something not listed? We tender bespoke.

Request a Quote